
Long rail transport units (LSEs) are components of the Robel rail transport system, which consists of LSEs and the SLW rail loading wagons. Wooden packing and fastening equipment are not needed.
Network operators like to finish construction work quickly, and Vossloh‘s logistics division is dedicated to pursuing this goal – with Easy Track Supply. We supply all kinds of construction sites with the right transport and loading systems: loading and unloading vehicles, rail unloading systems, Robel transport units and rail loading wagons. We can also transport rails safely to construction sites using freight wagons (e.g. from DB Cargo), and our switch transport wagons are the perfect solution for replacing turnouts. And for replacing rails, we even have a fully automatic assembly line system in our portfolio!